Track Bulletins For Benton Industrial Lead

As of 06/10/2026 @ 13:09:34

Void Date Restriction Issued
By
Start
MP
End
MP
Restriction Flags
Disp.
No. Type
05/19/26
12:20
392Cthall_cww1919 
Uneven ballast and trench work at Center street, watch footing and take precautions for slips trips and falls.
03/26/26
09:25
372Cthall_cww19.6319.63 
Be prepared to stop short of MP 19.63, Steptoe Crossing for men and equipment fouling tracks during ongoing construction. Ring bell and whistle for men and equipment Rule 5.8.1, 5.8.2
05/19/26
16:51
394TCMthall_cww19.6319.63 
Disturbed ballast, uneven footing at Steptoe. Take precautions to avoid slips, trips, and falls at Steptoe MP 19.63
06/11/24
08:11
184Cnzam_cww26.4626.97 
When leaving cars on the industrial lead to service Lamb Weston, do not leave more than 2000 ft. (~30 cars) between the Lamb Weston Switch and Saint Street Crossing. Multiple crossing malfunctions occurring when cars sit for too long within the SR-240 circuit.
04/11/25
08:14
276Cthall_cww27.227.2 
PORT OF BENTON YARD SCALE TRACK IS LINED AND LOCKED FOR SCALE BYPASS USE ONLY.
09/12/25
09:42
317Athall_cww28.5929.85 MPH NO
12/19/23
10:53
149Cnzam_cww29.7229.72 
The tracks beyond Horn Rapids Rd. at MP 29.73 ARE OUT OF SERVICE. ANY TRAFFIC BOUND FOR D.O.E. TRACK MUST BE ARRANGED IN ADVANCE, IN WRITING, WITH COLUMBIA RAIL GROUP.
12/19/23
10:49
148Cnzam_cww29.73 
Crossing warning system is disabled at Horn Rapids Road, MP:29.73 - Stop and protect crossing per rule 6.32.2(b) Procedure 1 [UP XG] even if devices are seen to be working. .

End of Track Bulletins


Highlighted = Item is less than a week old.